Project Overview

Our team have worked on some incredible projects over the years and delivered great outcomes for our clients.  We've taken some examples of what we have done for them and explained a bit more about each below.  

 
 
Smart Building.png

Smart Buildings

Asset optimisation to drive down Opex costs through better understanding and more efficient use.  Data analytics to show how assets are being used - data driven, not anecdotal.  Offer staff more mobile ways to work and transform the working environment.  With multi configurable spaces, personalised to their working, meeting or collaborative needs.  

How we helped our clients:  

  • Established the Vision for a Smart Building
  • Audit and baseline of current technologies
  • Road map to achieving the Vision
  • Market analysis of suitable options
  • Business Case   
  • Data driven decision making

 

London 2012 Olympics

Unified Communications 

The integration of multiple communication services such as web and video conferencing, voice, mobile, instant messaging and presence.  UC can improve productivity, deliver efficiency gains and reduce Opex costs.  Not to mention it is now expected by employees.  Deployment of solutions such as Skype for Business require detailed consideration.

How we helped our clients:  

  • Amendments to Telco contracts and services
  • Building fabric and M&E alterations
  • Advice on working practices and travel arrangement changes
  • Managed the UK deployment
  • Identifying and delivering the right type of training to maintain high adoption.  

 

Smart Buildings
 
 
 

Technology/ Construction Integration

Integrating Technology within the built environment is challenging and often seen as the element with the largest risk.  Early engagement with the IT Department and the design team can mitigate some of these risks.  Our team have successfully integrated technology into some of the most complex and challenging projects.

How we helped our clients:  

  • IT Strategy aligned with project Vision
  • Integrating the IT requirements with RIBA Stages   
  • Design of all IT & AV Systems
  • Procurement options which maximise return on investment
  • Quality Assurance 
  • Operational planning for post project BAU
 

Audio Visual 

Audio Visual is one of the most visible elements within today’s modern designs and is key to so many elements.  From the look & feel of a space, to brand awareness and the effective engagement with colleagues and customers.  Done right, it can have a great impact on your space.  Good AV design allows meetings to be productive, instead of trying to make it work.

How we helped our clients:  

  • Comprehensive requirements gathering
  • Production of initial AV concepts, through to full design packages
  • Integrating the AV requirements with RIBA Stages   
  • Procurement options which maximise return on investment
  • Bespoke training sessions for different user types

 

Unified Communications

London 2012 Olympic Games

Home to 21,000 international Broadcasters and Press during the London 2012 Olympic Games, the International Broadcast Centre and Main Press Centre (IBC/MPC) were the hub for all press and broadcasting services with a global audience reaching 4 billion people.  

How we helped our client:  

  • Managed a 400% scope/ budget increase and still achieved the original open date of 27 Jun 12 (first Olympic Park operational venue) 
  • Delivered G59 tests and generator sync on/off capability (34nr generators/ 34 Megawatts) 
  • Negotiated build over agreements with UK utility companies
  • Managed all hard and soft FM services during Games time

 

IT Relocation

A successful IT relocation is paramount to ensuring your business is operational on day one.  But it is equally important to staff embracing and enjoying their new environment and adopting new working practices.  To be successful it requires many internal and external teams to come together to deliver their specific objective in a coordinated and timely manner.

How we helped our clients:  

  • Physical and network audit of all systems
  • Relocation of WAN and MAN Links
  • Procurement and management of relocation company
  • Physical relocation of all hardware
  • Soft Landing support before and after the move